Been verti drained. 12 inch spikes forced into the ground to lift the divots then had 60 tonnes of compound raked in all over. This will have a long term effect cutting down on the amount of cutting up and divots. It has also filled in around 90% of the holes that were there. The pitch looks great at this time of year but it needed this work done badly. As for re-laying that would be to expensive. Take the pitch at Donny that cost 1million quid.