Saturday was another busy day down at the Recreation Ground, the trusses have now been put in place and the whole job is taking shape very nicely, the old floor coverings have been removed and 80% of the old ceilings have been pulled down, and both both external walls have been constructed to the connecting bridge between the two bars. Thanks to those volunteers who came down on Saturday to give us a helping hand. Thanks also to 'Ricky from Zest Harbourside' who came down to give us advice on the layout of of our new catering kitchen and catering unit.